Booked vs. actual: why your calendar gets meeting cost wrong

Calendar-based meeting cost estimates price the invite, not the meeting. Late starts, no-shows and overruns can move the real cost by a quarter to a half.

Bilal Gümüş

· 5 min read

Almost every meeting cost calculator, including the one built into most people's heads, prices the calendar invite: everyone invited, for exactly the booked length. Real meetings don't work like that. People join late, leave early or don't turn up, and meetings run over or finish early.

In the examples below, those differences move the real cost of a meeting by a quarter to a half in either direction. Sometimes they cancel out, and the total looks right while the details are wrong.

A note on the numbers: this post uses an illustrative model, not measured data. The assumptions are stated, and where research exists on how often each thing happens, we've linked it. We'll update this post if reliable measured data becomes available.

The meeting we'll use

A weekly one-hour meeting with eight invitees, each earning $100,000 a year, which is $48.08 an hour. Priced from the calendar:

8 people × 60 minutes = 480 person-minutes = $384.62

That's the booked cost. Here's what can happen to it.

Scenario 1: the meeting runs over

Everyone turns up and the meeting runs 15 minutes past its end time.

8 people × 75 minutes = 600 person-minutes = $480.77

That's 25% more than the calendar says. Overruns are invisible to calendar-based estimates, because the calendar entry still says 60 minutes. And meetings that regularly overrun are exactly the ones worth fixing.

Scenario 2: the optional invitees don't come

Three of the eight were optional and skip it. With fewer people, it wraps up after 45 minutes.

5 people × 45 minutes = 225 person-minutes = $180.29

That's 53% less than the calendar says. If you were reviewing meetings from calendar data, this one would look like one of your most expensive. In practice, people have already cut it themselves.

Scenario 3: it all cancels out

One person doesn't show up. One joins 7 minutes late. One leaves 15 minutes early. The meeting runs 10 minutes over.

5 people × 70 minutes + 63 + 55 = 468 person-minutes = $375.00

Within 3% of the booked cost. The total looks accurate, but none of the details are. If the person who skipped was a $200,000 director and the overrun mostly kept junior staff, even the total would be off.

How often does this happen?

There's more research on lateness than on anything else here:

  • People admit to arriving late to about 5% of their meetings, according to a study by Steven Rogelberg and colleagues of 195 employees reporting on more than 300 meetings.
  • That sounds rare, but meetings have several attendees. With an average of eight people per meeting in that sample, 37% of meetings started late.
  • Late starts make meetings worse, not just more expensive. In a lab experiment by Nale Lehmann-Willenbrock and Joseph Allen with 32 student groups, those whose meeting started 10 minutes late rated it as less satisfying than groups that started on time.

And some meetings never reach the calendar at all. Microsoft's 2025 Work Trend Index found that 57% of meetings were ad hoc calls without a calendar invite (the report's methodology section says 60%). A calendar-based estimate can't see any of those.

We haven't found reliable research on how often meetings overrun or how often invitees skip. The vendor figures that circulate don't explain their method, so we've left them out.

The cost of waiting

Lateness has its own cost, paid by the people who arrived on time. If seven people wait five minutes for the eighth before starting:

7 people × 5 minutes = 35 person-minutes = $28.04

That doesn't sound like much. But if it happens every week, it's $1,346 a year for one meeting, spent on people looking at a "waiting for others to join" screen.

Why it matters which number you use

If you're estimating total meeting spend across a whole company, the booked figure is a reasonable starting point. Overruns and no-shows partly cancel out, as scenario 3 shows.

It breaks down when you use it to decide which meetings to change, which is the whole point of measuring them:

  • Meetings people already skip look expensive. You might spend effort cutting a meeting that's half-empty anyway.
  • Meetings that overrun look cheaper than they are. The meeting that most needs a firmer end time looks fine on paper.
  • Unscheduled calls don't appear at all. If most meetings never get a calendar invite, a calendar-only view misses a lot of what's happening.

How to see the actual numbers

Both major platforms record who actually joined:

  • Google Meet can produce attendance reports with join and leave times on some Google Workspace plans.
  • Microsoft Teams produces attendance reports showing when each person joined and left. We cover who can get one, and why it's sometimes missing, in Teams attendance reports. Organizers and co-organizers can download them.

You can match these against salaries in a spreadsheet for a handful of meetings. It's tedious, but doing it once for your five biggest recurring meetings is worth it.

This is also the problem Burnmeter was built around. It prices each meeting from your team's salaries, then checks the estimate against Google Meet attendance and Microsoft Teams attendance reports, so the cost you see is for the meeting that actually happened. For Teams, that works for meetings the connected account organized, because Microsoft restricts attendance reports in its API to a meeting's organizers.

What to do with this

You don't need perfect data to act. Pick your three most expensive recurring meetings, using the method in how much does a meeting cost, and check them against reality for a couple of weeks. Who turned up? When did it really end?

You'll probably find at least one meeting that people have quietly abandoned and one that always runs long. Both are easy wins. Once you know the real cost of your recurring meetings, they're also easy decisions to justify.